In Association With

Home
About Future-Fab
Download New Issue
Contact Us
Volume Archives
Editorial Panel

FUTURE FAB ARCHIVES


300mm Wafer Factory Automation and the Logistics Infrastructure Challenge
(6/29/2001) Future Fab Intl. Issue 11
By Len Foster, Texas Instruments Incorporated
Print Article Print this paper
Send As Email Send as email

Efforts to achieve functional and cost-effective operational interfaces for 300mm wafer fabs began in the mid-1990s through the collective efforts of device manufacturers’ participation in the International 300mm Initiative (I300I), Japan 300mm Working Group (J300), Semiconductor Leading Edge Technologies (SELETE), and International SEMATECH. The goal was to define common requirements and guidelines for integration of fab production tools and automation systems. This joint effort was followed up with equipment suppliers and device maker representatives’ work in creating a new set of 300mm SEMI standards to be used in defining industry-standard equipment design requirements.

While much effort has been expended to put guidance publications and SEMI standards in place which project a logistics infrastructure ‘model’ for the fully automated 300mm fab, it is widely recognized that the implementation of the new logistics infrastructure is a much larger undertaking. This undertaking at each 300mm fab requires coordinated efforts by equipment suppliers, control systems suppliers, facilities contractors, and device maker staffs.

Please login below to access the full text of this paper. If you are not currently an online member or subscriber sign-up today, it's free. For online membership, click here.

Email:
  Remember my User ID 
 

Not a member? Sign up today, it's free.

 
 
Search




Published By:
38 Miller Avenue, Suite 9, Mill Valley, CA 94941
415.381.6800 | 415.381.6803
www.mazikmedia.com
converse@mazikmedia.com
Disclaimer | Privacy Policy